KALO

Costing Run: Costing Objects (KVMK) | #masterdata | Component: Product Cost Planning
Column Name Description
MANDT Client
KALAID Name of Costing Run
KALADAT Costing Run Date
TVERS Costing Version
DISST Low-Level Code
KALVZAE Numerator for Costing Run Tables (KAL*)
Column Name Description
Column Name Description
📏 Base Unit of Measure (MEINS):
LOSGR Planned lot size
SUMLO Planned lot size
LOSAU Lot Size Taking Scrap into Account
📏 Base Unit of Measure (PR_MEINS):
PR_LOSGR Planned lot size
PR_SUMLO Planned lot size
PR_LOSAU Lot Size Taking Scrap into Account
Column Name Description
KALADAT Costing Run Date
KADAT Date
BIDAT Costing Date To
ALDAT Quantity Structure Date for Costing
BEDAT Requirements Date
BWDAT Valuation Date of a Cost Estimate
Column Name Description
SELKZ Checkbox Show values
ROHSTOFF Material Component Show values
SUMMENSATZ Checkbox Show values
FEH_STATUS Costing Status Show values
FEH_STATUF Costing Status for Marked/Released Objects Show values
CUOBJID Indicator for Configurable Objects Show values
KZKUP Indicator: Material can be co-product Show values
STVFIX Checkbox Show values
SBDKZ Dependent requirements ind. for individual and coll. reqmts Show values
ALTSL Method for Selecting Alternative Bills of Material Show values
MLMAA Material Ledger Activated at Material Level Show values
BESKZ Procurement Type Show values
Column Name Description Domain name
VBELN Sales and Distribution Document Number VBELN
POSNR Item number of the SD document POSNR
VERID Production Version VERID
STNUM Bill of Material STNUM
STALT Alternative BOM ALTNR
PLNNR Key for Task List Group PLNNR
PLNAL Group Counter ALTNR
PLNCT Internal counter CIM_COUNT
FEH_A_ANZ No. System Messages in Selection/Qty Structure Determination CK_INT4
FEH_K_ANZ Number of System Messages in Costing CK_INT4
KALNR Cost Estimate Number - Product Costing CK_KALNR
BWTAR Valuation Type BWTAR
ERFNM Entered By USNAM
SOWRK Special Procurement Plant - Costing WERKS
KOSGR Costing Overhead Group CK_KOSGR
ZSCHL Costing Overhead Key CHAR6
CUOBJ Object Number for Conf. Objects CUOBJ
PROZESS Process Through Which Co-Product Was Costed MATNR
AUSSS Assembly scrap in percent DEC3_2
PRCTR Profit Center PRCTR
SPART Division SPART
Master Data Relations Join Conditions
MRP Controller
  • Plant
  • MRP Controller
  • Client
  • KALO.WERKS == T024D.WERKS
  • KALO.DISPO == T024D.DISPO
  • KALO.MANDT == T024D.MANDT
Purchasing Group
  • Purchasing Group
  • Client
  • KALO.EKGRP == T024.EKGRP
  • KALO.MANDT == T024.MANDT
Laboratory/design office
  • KALO.MANDT == T024L.MANDT
  • KALO.LABOR == T024L.LABOR
Material Number
  • Material Number
  • Client
  • KALO.MATNR == MARA.MATNR
  • KALO.MANDT == MARA.MANDT
Base Unit of Measure
  • KALO.MANDT == T006.MANDT
  • KALO.MEINS == T006.MSEHI
Material type
  • KALO.MANDT == T134.MANDT
  • KALO.MTART == T134.MTART
Task List Type
  • KALO.MANDT == TCA01.MANDT
  • KALO.PLNTY == TCA01.PLNTY
Base Unit of Measure
  • KALO.MANDT == T006.MANDT
  • KALO.PR_MEINS == T006.MSEHI
Production version of process material
  • Plant
  • Process Through Which Co-Product Was Costed
  • Production Version To Be Costed
  • Client
  • KALO.WERKS == MKAL.WERKS
  • KALO.PROZESS == MKAL.MATNR
  • KALO.PR_VERID == MKAL.VERID
  • KALO.MANDT == MKAL.MANDT
Special Procurement Key for the Costing Object
  • Plant
  • Special Procurement Key for the Costing Object
  • KALO.MANDT == T460A.MANDT
  • KALO.WERKS == T460A.WERKS
  • KALO.SOBSL == T460A.SOBSL
BOM Usage
  • KALO.MANDT == T416.MANDT
  • KALO.STLAN == T416.STLAN
Variant
  • Configured Material (Variant)
  • Client
  • KALO.TYPE == MARA.MATNR
  • KALO.MANDT == MARA.MANDT
Plant
  • KALO.MANDT == T001W.MANDT
  • KALO.WERKS == T001W.WERKS
Other Relations | to Master Data Relations ↑ Join Conditions
Responsible Planner Group or Department
  • Plant
  • Responsible Planner Group or Department
  • Client
  • KALO.WERKS == T024A.WERKS
  • KALO.VAGRP == T024A.FEVOR
  • KALO.MANDT == T024A.MANDT