T438M

Control Parameter for MRP -Material Level- | view | #masterdata | Component: Master Data
Column Name Description
MANDT FK Client
WERKS FK Plant
MTART MRP Group
Column Name Description
Column Name Description
Column Name Description
Column Name Description
BANER Creation Indicator for Purchase Requisitions Show values
DISER Creation Indicator for MRP Lists Show values
LIFKZ Automatic Schedule Lines (Scheduling Agreements) Show values
GTERM Scheduling according to purchasing info record or agreement Show values
KZDRB Indicator: direct procurement/production MRP Show values
XFAT1 Firm Only Schedule Lines Transmitted to Vendor by Purchasing Show values
XFAT2 Fant. 2 Show values
VRMOD Consumption mode Show values
PLSEL Issue Storage Location Selection Show values
RVPKZ Adjustment of Planned Independent Requirements Show values
SHFLG Safety time indicator (with or without safety time) Show values
EXSGT Do not explode bulk material items Show values
BESAL Determination of explosion date for BOM and routing Show values
GRREL Relevant for requirements grouping for project stock Show values
VERTR Start date of order proposals allowed in the past Show values
FKOBS ATP check by full confirmation logic Show values
PREQAPPROVAL Purchase Requisition Handover to Purchasing Required Show values
Column Name Description Domain name
UMTHZ Rescheduling horizon NUM03
FIXHZ Planning Time Fence NUM03
PLAHZ Planning horizon NUM03
SBDIS Share of safety stock which can be used for planning NUM03
VWVOR Tolerance value for bringing forward receipt elements NUM02
VWVER Tolerance value for displacement in the future NUM02
VINT1 Consumption period: backward VRINT
VINT2 Consumption period: forward VRINT
RESHZ Roll forward period for the master plan RESHZ
ANDIS Number of Days After Which the Material Must Be Planned INT2
RESVP Period of adjustment for planned independent requirements RESVP
SHZET Safety Time (in Workdays) NUMC2
Master Data Relations Join Conditions
Order type for process order
  • T438M.MANDT == T003O.CLIENT
  • T438M.AUAR2 == T003O.AUART
Order Type
  • T438M.MANDT == T003O.CLIENT
  • T438M.AUART == T003O.AUART
MRP: Document type purchase requisition for subcontracting
  • ?
  • MRP: Document type purchase requisition for subcontracting
  • T438M.MANDT == T161.MANDT
  • T438M.[column in domain "BSTYP"] == T161.BSTYP
  • T438M.BARTL == T161.BSART
MRP: purchase requisition for stock transfer - document type
  • ?
  • MRP: purchase requisition for stock transfer - document type
  • T438M.MANDT == T161.MANDT
  • T438M.[column in domain "BSTYP"] == T161.BSTYP
  • T438M.BARTU == T161.BSART
MRP:doc.type purchase requisitions for standard purchase ord
  • ?
  • MRP:doc.type purchase requisitions for standard purchase ord
  • T438M.MANDT == T161.MANDT
  • T438M.[column in domain "BSTYP"] == T161.BSTYP
  • T438M.BSART == T161.BSART
Evaluation Prof.
  • Plant
  • Evaluation Profile for Range-of-Coverage Data
  • Client
  • T438M.WERKS == T465.WERKS
  • T438M.EVAPR == T465.EVAPR
  • T438M.MANDT == T465.MANDT
Client T438M.MANDT == T000.MANDT
Action Control: Planned Order Processing
  • Action Control: Planned Order Processing
  • ?
  • ?
  • T438M.MANDT == T46AC.MANDT
  • T438M.MDACH == T46AC.MDACH
  • T438M.[column in domain "MDACC"] == T46AC.ACCFM
  • T438M.[column in domain "MDACN"] == T46AC.ACCTO
Checking rule for the availability check
  • Checking rule for the availability check
  • Client
  • T438M.PRREG == T441R.PRREG
  • T438M.MANDT == T441R.MANDT
Planning Strategy Group
  • T438M.MANDT == T461P.MANDT
  • T438M.STRGR == T461P.STRGR
Plant
  • T438M.MANDT == T001W.MANDT
  • T438M.WERKS == T001W.WERKS
Other Relations | to Master Data Relations ↑ Join Conditions
Period Splitting
  • T438M.MANDT == T459S.MANDT
  • T438M.PRASTA == T459S.PRASTA