| ORDER_SORT | Sorting Procedure when Creating Several Orders | Show values | 
| NETCH | Reuse Mode for Receipts | Show values | 
| REQUESTED_QTY | is no longer used | Show values | 
| FIXRECEIPT_FIRST | Net Requirements Calculation Procedure | Show values | 
| LOT_POPUP_FLG | Display Lot Size Dialog Box in Interactive Planning | Show values | 
| REDUCE_SURPLUS | Reduce Surplus | Show values | 
| PLAN_DEFICITS | Plan Shortages | Show values | 
| PARALLEL_FLAG | Parallel Processing | Show values | 
| CALC_DISST_FLG | Control Indicator for Recalculation of Low-Level Codes | Show values | 
| PERIOD_ID | Period Indicator | Show values | 
| PERVR_1 | Period Type for Periodic Lot Sizes in Short Term Horizon | Show values | 
| PERVR_2 | Period Type for Periodic Lot Sizes in Medium-Term Horizon | Show values | 
| PERVR_3 | Period Type for Periodic Lot Sizes in Long-Term Horizon | Show values | 
| REQ_COVER_1 | Period Factor for Calculating the Availability Date/Time | Show values | 
| REQ_COVER_2 | Period Factor for Calculating the Availability Date/Time | Show values | 
| REQ_COVER_3 | Period Factor for Calculating the Availability Date/Time | Show values | 
| REQ_COVER_FLAG1 | Use Period Factor | Show values | 
| REQ_COVER_FLAG2 | Use Period Factor | Show values | 
| REQ_COVER_FLAG3 | Use Period Factor | Show values | 
| PERVR_S | Period Type for Calculating the Short-Term Horizon | Show values | 
| PERVR_M | Period Type for Calculating the Medium-Term Horizon | Show values | 
| LOSVF_1 | Lot-Sizing Procedure | Show values | 
| LOSVF_2 | Lot-Sizing Procedure | Show values | 
| LOSVF_3 | Lot-Sizing Procedure | Show values | 
| PROCEDURE_TYPE | Select. Option for Groff Procedure or Part Period Balancing | Show values | 
| TRUNC_CONDITION | Indicator for data origin | Show values | 
| SET_MODE_OUTACT | Set mode for output activity on basis of a resource | Show values | 
| FIX_CHANGES | Fix Shifted Orders | Show values | 
| PUSH | Move Orders into the Future | Show values | 
| PULL | Bring Orders Forward | Show values | 
| CONSIDER_STORAGE | Consider storage costs | Show values | 
| FIX_PEG_ONLY | Only Shift Dates for Fixed Pegging Relationships | Show values | 
| ANALYSE_FLAG | Generate Evaluation | Show values | 
| COSTS_FLAG | Only Calculate Total Costs | Show values | 
| BUCKET_IND | Accuracy for Determining Storage Costs | Show values | 
| MULTILEVEL | Flag for Multilevel Planning | Show values | 
| PUSH_DIRECTION | Shift Direction for Order/Requirement Dates | Show values | 
| SPLIT_ORDERS | Indicator for splitting orders by time period limits | Show values | 
| CHECK_ORD_PLSTAT | Only Consider Orders that are Fully Scheduled | Show values | 
| CHECK_COMP | Mode for Component Check | Show values | 
| CHECK_COMPONENT | Plan Components Independent of Automatic Planning | Show values | 
| PLANNING_MODE | PP/DS: Planning Behaviour During Conversion | Show values | 
| PLANNED_STATUS | Scheduling Status | Show values | 
| FIX_NEW_ORDERS | Indicator for Firming New Orders | Show values | 
| USE_SNP_SOURCES | Use SNP Sources of Supply | Show values | 
| CONV_CTM_ORDERS | Indicator for Conversion of Time Continuous CTM Orders | Show values | 
| BESKZ | Procurement Type | Show values | 
| USE_PLAN_HEUR | Use Heuristic | Show values | 
| FIRM_DEL_PEGGING | Processing Mode for Pegging Relationships | Show values | 
| CONSID_SNP_DEFIC | Consider Shortages Outside the PP/DS Horizon | Show values | 
| SORT_DISST_INVER | Sort low-level codes in descending order | Show values | 
| SINGLELEVEL | Create Planning File Entry for Component | Show values | 
| SAVE_WITH_CYCLES | Save Low-Level Codes with Cycles | Show values | 
| NO_TRANSP_LINES | Do Not Use Transportation Lanes | Show values | 
| PLAN_SEL_PROD | Only Plan Selected Products | Show values | 
| DISST_FROM_R3 | Low-Level Code from R/3 | Show values | 
| LLC_FOR_PACKAGES | Do not Consider Plng Packages when Determ. Low-Level Codes | Show values | 
| COVER_SNP_PERVR | Period Type | Show values | 
| ORG_EROFF0 | Consider Products with Opening Period of 0 Days | Show values | 
| ORG_EROFFN | Only Orders Outside the Opening Period | Show values | 
| ORG_INHOUSE | Execute Heuristic for In-House Production Orders | Show values | 
| ORG_EXTERNAL | Execute Heuristic for External Procurement Orders | Show values | 
| ORG_SEL_ORDERS | Do Not Adjust Orders on Higher Production Levels | Show values | 
| ORG_FIX_ORDERS | Adjust Fixed Orders | Show values | 
| ORG_FORECAST | Always Adjust Planned Independent Requirements | Show values | 
| ONLY_IF_NETCH | Dummy Data Element for Boolean Fields | Show values | 
| NO_MATRIX_EXPL | Dummy Data Element for Boolean Fields | Show values | 
| USE_SHELF_LIFE | Plan with Shelf Life | Show values | 
| LIST_FLG | Indicator: Create Product List | Show values | 
| USE_EOG | Use Multiple Output Planning | Show values | 
| EOG_PLAN_ENDREQS | Planning of Pegged Requirements in MOP Heuristic | Show values | 
| REUSE_STRATEGY | Reuse Strategy | Show values | 
| OFFSET_ASC_HOR | Use Offset for Requirements Ascertainment Horizon Too | Show values | 
| OFFSET_ORG_HOR | Use Offset for Adjustment Horizon Too | Show values | 
| MRP_FLAG | Heuristic Called From MRP | Show values | 
| DEL_PEGGING_TYPE | Pegging Relationship to be Deleted | Show values | 
| COLLECT_PAST_REQ | Group Past Requirements | Show values | 
| NETCH_FEA | Planning File Entry for Feasibility Check | Show values | 
| CHECK_STATUS | Check Current Status of the Sales Scheduling Agreement Items | Show values | 
| STANEW_VALID | Status "new" is regarded as admissible | Show values | 
| STAEOK_VALID | Status "Admissibility OK" is regarded as admissible | Show values | 
| STAENOK_VALID | Status "Admissibility Not OK" is regarded as admissible | Show values | 
| STAFOK_VALID | Status "Feasibility OK" Is Regarded as Permissible | Show values | 
| STAFNOK_VALID | Status "Feasibility Not OK" is regarded as admissible | Show values | 
| STACMA_VALID | Status "Full Confirmation" is regarded as admissible | Show values | 
| STACDE_VALID | Status "Partial Confirmation" is regarded as admissible | Show values | 
| ORDER_SELECTOR | Type of Order to be Converted | Show values | 
| PPDS_ORDER | Status with which PP/DS Orders Should be Created | Show values | 
| LOTSIZE | Lot Sizes for PP/DS Orders | Show values | 
| SFTY_ACTUAL_DATE | Put Safety Stock Requirements on Current Date/Time | Show values | 
| SFTY_CREATE_FLAG | Create and Adjust Safety Stock Requirements | Show values | 
| SFTY_DELETE_FLAG | Delete Existing Safety Stock Requirements | Show values | 
| PLAN_SCOPE | Scope of Planning in Relation to I/O Nodes in Heuristic | Show values | 
| CUT_CONTROL | Cutting Control Configuration | Show values | 
| CUT_CONTROL_2 | Cutting with/without Cutting Orders | Show values | 
| CUT_RULE | Configuration of Cutting Rule | Show values | 
| PROD_CONTROL | Configuration of Production Control | Show values | 
| DEL_RULE | Configuration of Delivery Rule | Show values | 
| PEG_CONTROL | Configuration of Pegging Control | Show values | 
| MOP_CONTROL | Define Multiple Output Planning (MOP) | Show values | 
| MOP_RULE | Define Grouping | Show values | 
| LPP_NETCH | Reuse Mode for LPP Heuristic | Show values | 
| HEU_PLAN_CONTROL | Controls Start of Automatic Heuristic Planning | Show values | 
| DMND_SORT | Setting according to which date the requirements are sorted | Show values | 
| PLAN_STRATEGY | Selection of Planning Strategy to be Applied | Show values | 
| USE_LOT_SIZE | Use Lot Size Settings from Heuristic | Show values | 
| LGKND | Lot-Size Calculation in Make-to-Order Production | Show values | 
| LASTL | Last Lot Exact | Show values | 
| REORD_METHOD | Reorder Point Method | Show values | 
| TARGET_METHOD | Target Stock Level Method | Show values | 
| PERVR | Period Type | Show values | 
| REQ_COVER_TYPE | Period Factor for Calculating the Availability Date/Time | Show values | 
| REQ_COVER_FLAG | Use Period Factor | Show values | 
| SL_LSZ_EXACT | Lot-for-Lot Order Quantity | Show values | 
| SL_LSZ_FIXED | Fixed Lot Size | Show values | 
| SL_LSZ_PERI | Period Lot Size | Show values | 
| SL_LSZ_REORD | Reorder Point Method | Show values | 
| MSDP_SB_METHOD | Method for Calculating Safety Stock | Show values | 
| UNTKZ | Underdelivery Tolerance | Show values | 
| RECALC_DYN | Restore Requirements Based on Dynamic Pegging | Show values | 
| RECALC_HFX | Restore Requirements on Basis of Manually Fixed Pegging | Show values | 
| RECALC_SFX | Restore Requirements on Basis of Automatically Fixed Pegging | Show values | 
| ALLOC_STRATEGY | Assignment Strategy | Show values | 
| USE_CHECKHORIZON | Use User-Defined Time Interval | Show values | 
| USE_PL_TIMEFENCE | Use PP/DS Planning Time Fence | Show values | 
| USE_PL_DEL_TIME | Use Planned Delivery Time | Show values | 
| DIALOG | Display Selected Orders | Show values | 
| PRIORITY_RULE | Priority Rule | Show values | 
| USE_HEUR_STRAT | Use Strategy Settings from Heuristic | Show values | 
| UPGRADE_FLG | Indicator for Upgrade from 3.0 or 3.1 to 4.0 | Show values | 
| PEGCOUNT_ALL | Indicator for Consumption in Background | Show values | 
| PEG_DYN | Fixed Pegging Relationships on Basis of Dynamic Pegging | Show values | 
| PEG_BATCH | Fixed Pegging Relationships on Basis of Batches | Show values | 
| PEG_USER_DEF | User-Defined Settings for Fixed Pegging Relationships | Show values | 
| PRIMARY_DEMAND | Pass On Independent Requirements Information | Show values | 
| PEGGING_RULE | Pegging Rule | Show values | 
| HORIZON | Pegging Horizon for Fixed Pegging Relationships | Show values | 
| CONFIRMED_SUPPLY | Only Take Account of Confirmed Receipts | Show values | 
| CONFIRMED_DEMAND | Only Consider Confirmed Requirements | Show values | 
| UNCONF_DEMAND | Only Take Unconfirmed Requirements into Account | Show values | 
| CDOC_HIDEDYNPRO | Do Not Display Dialog Box | Show values | 
| CDOC_HIDEALVTB | Do Not Display ALV Toolbars | Show values | 
| CDOC_ITERLIN | Calculation Procedure for the Order Quantity | Show values | 
| CDOC_PREFEXETYP | Execution Type | Show values | 
| CDOC_KEEPPLNMODE | Retain Scheduling Status for Dependent Operations | Show values | 
| CDOC_ALLOWOFFSET | Scheduling to the Past Allowed | Show values | 
| CDOC_NOCHANGES | Changes Not Permitted Without Customizing Authorization | Show values | 
| CDOC_CONSONLYRND | Only Take Rounding Value Into Account | Show values | 
| CDOC_MINMAXCONS | Take Min/Max Lot Size from Product Master Into Account | Show values | 
| CDOC_USEEXACTLTS | Use Exact Lot Size | Show values | 
| CDOC_PLGFILEENTR | Write Planning File Entry | Show values | 
| NOT_KEEP_MODE | Retain Mode on New Explosion | Show values | 
| KEEP_SCHED_DATE | Retain Operation Dates on New Explosion | Show values | 
| STRAT_EXP_VIEW | Expert View for Strategy Tab Page | Show values | 
| CONS_SAFETY_TIME | Take Safety Time Into Account | Show values | 
| PLAN_SEL_OBJS | Only Plan Selected Orders | Show values | 
| DEM_PROP_MULTI | Multilevel Distribution Propagation | Show values | 
| USE_TOT_RECPTS | Use Total Receipts in Net Requirement Calculation | Show values | 
| USE_TOT_STOCKS | Use Total Stocks in Net Requirement Calculation | Show values | 
| STKTRAN_PROCESS | PP/DS Stock Transfer Process for Deployment | Show values | 
| PEGGING_TYPE | Pegging Relationships for Propagation | Show values | 
| SHELF_LIFE_RULE | Shelf Life Propagation Rule | Show values | 
| MANUAL_SELECTION | Manual Selection Profile | Show values | 
| SAVE_SNP_LLC | Save SNP LLC Results to Database | Show values | 
| RESCHED_ENABLE | Enable Rescheduling | Show values | 
| INTSRC_FLG | Enable/Disable Interactive Sourcing | Show values | 
| ACT_PLACE_STRAT | Activity Placement Strategy | Show values | 
| SUPPRESS_SUPPLYS | Suppress further processing of changed objects | Show values | 
| PROP_LOTSZ_SET | Propagate Lot Size Settings | Show values | 
| MRP_LIVE_HEUR | Setup for One MRP Heuristics for PP/DS on ERP | Show values | 
| DSOPT_RUN | Execute DS Optimizer | Show values | 
| RESPECT_BUCK_STRT | Respect Bucket Start for Resource type | Show values | 
| PRIORITY_CALC_METHOD | Priority Calculation Method for DDMRP Scheduling | Show values | 
| LOG_OPTIONS | Log Display | Show values | 
| FAULT_TOLERANCE | Demand Driven Scheduling Error Tolerance | Show values | 
| RELATIVE_TIME_UNIT_TYPE | Time Unit Type (Months,Weeks,Days,Hours) | Show values | 
| DATE_TYPE | Date Type (Absolute or Relative) | Show values | 
| WEEK_START | Week Start | Show values |