2LIS_04_P_ARBPL

Work Center View from PP/PP-PI | #TRAN | Extraction method: F1 | Delta: ABR | Component: Production Planning and Control
Tables used: QALSAFKOVBRPAFPOBSEG ... +188 more
Column Name Description
AUFNR FK Order Number
BUKRS Company Code
MATNR FK Material Number
WERKS FK Plant
ZEITP Event for which updating should take place
Column Name Description
Column Name Description
📏 Unit of Measure for Teardown (ARUZE):
ABRUE Scheduled teardown time
I_ABRUE Actual teardown
📏 Unit of measure for activity (MEINH):
ASVRG Operation Scrap Quantity
GMNGA Total Delivered Lot Size
LMNGA Total quantity confirmed
MGVRG Operation quantity
RMNGA Total Confirmed Rework Quantity
XMNGA Total Scrap Quantity Confirmed
📏 Unit of measure for execution time (DFZEH):
A_TAB Deviation in scheduled output date
I_DFZ Actual execution time
I_DLZ Actual lead time
R_TAB Relative schedule deviation
S_DFZ Target execution time
S_DLZ Target lead time
Z_TAB Deviation from scheduled input date
📏 Unit of measure for processing time (BEAZE):
BEARZ Scheduled processing time
I_BEARZ Actual processing time
📏 Unit of measure for 1st activity to be confirmed (ILE01):
ISM01 Confirmed activity 1 - activity type
📏 Unit of measure for 2nd activity to be confirmed (ILE02):
ISM02 Confirmed activity 2 - activity type
📏 Unit of measure for 3rd activity to be confirmed (ILE03):
ISM03 Confirmed activity 3 - activity type
📏 Unit of measure for 4th activity to be confirmed (ILE04):
ISM04 Confirmed activity 4 - activity type
📏 Unit of measure for 5th activity to be confirmed (ILE05):
ISM05 Confirmed activity 5 - activity type
📏 Unit of measure for 6th activity to be confirmed (ILE06):
ISM06 Confirmed activity - activity type 6
📏 Unit for execution time (exact) (DFZEXEH):
I_DFZ_EX Actual execution time (exact)
I_DLZ_EX Actual lead time (exact)
S_DFZ_EX Target execution time (exact)
S_DLZ_EX Target lead time (exact)
📏 Unit of Measure for Setup Time (RSTZE):
I_RUEST Actual setup time
RUEST Scheduled setup time
📏 Unit of Measure for Capacity Requirements (KEINH):
KABRS Scheduled cap. requirements for the op. segment teardown
KBEAS Scheduled cap. requirements for the op. segment "processing"
KRUES Scheduled cap. requirements for the op. segment "setup"
📏 Unit of Measure for Wait Time (LIGZE):
LIEGZ Wait Time Used for Scheduling
📏 Unit of measure for standard value 1 (VGE01):
SMNG1 Quantity to be confirmed for activity type 1
ZMNG1 Target quantity of activity type 1
ZMNG1OZ Target quantity/activity type 1 w/o perfmnce efficiency rate
📏 Unit of measure for standard value 2 (VGE02):
SMNG2 Quantity to be confirmed for activity type 2
ZMNG2 Target quantity of activity type 2
ZMNG2OZ Target quantity/activity type 2 w/o perfmnce efficiency rate
📏 Unit of measure for standard value 3 (VGE03):
SMNG3 Quantity to be confirmed for activity type 3
ZMNG3 Target quantity of activity type 3
ZMNG3OZ Target quantity/activity type 3 w/o perfmnce efficiency rate
📏 Unit of measure for standard value 4 (VGE04):
SMNG4 Quantity to be confirmed for activity type 4
ZMNG4 Target quantity of activity type 4
ZMNG4OZ Target quantity/activity type 4 w/o perfmnce efficiency rate
📏 Unit of measure for standard value 5 (VGE05):
SMNG5 Quantity to be confirmed for activity type 5
ZMNG5 Target quantity of activity type 5
ZMNG5OZ Target quantity/activity type 5 w/o perfmnce efficiency rate
📏 Unit of measure for standard value 6 (VGE06):
SMNG6 Quantity to be confirmed for activity type 6
ZMNG6 Target quantity of activity type 6
ZMNG6OZ Target quantity/activity type 6 w/o perfmnce efficiency rate
📏 Unit of Measure for Move Time (TRAZE):
TRANZ Move time used for scheduling
📏 Unit of Measure for Queue Time (WRTZE):
WARTZ Queue time used for scheduling
Column Name Description
FTRMI Actual release date
BUDAT Posting date of last confirmation
FSAVD Earliest scheduled start: Execution (date)
FSEDD Earliest scheduled finish: Execution (date)
IADD Actual input date
IEAVD Actual Operation End Date
IEDD Actual Execution End Date
ISAVD Actual Operation Start Date
ISDD Actual Execution Start Date
SSADD Latest target input date
SSAVD Latest scheduled start: Execution (date)
SSEDD Latest scheduled finish: Execution (date)
Column Name Description
ROCANCEL Indicator: Cancel Data Record Show values
Column Name Description Domain name
ARBPL Work Center ARBPL
GRUND Reason for Variance CO_AGRND
LOGRP Wage Group LOHNGRP
PERNR Personnel number PERNR
QUALF Suitability QUALF
UVORN Suboperation VORNR
VORNR Operation/Activity Number VORNR
ZGR01 Target performance efficiency rate for activity type 1 PROZENT101
ZGR02 Target performance efficiency rate for activity type 2 PROZENT101
ZGR03 Target performance efficiency rate for activity type 3 PROZENT101
ZGR04 Target performance efficiency rate for activity type 4 PROZENT101
ZGR05 Target performance efficiency rate for activity type 5 PROZENT101
ZGR06 Target performance efficiency rate for activity type 6 PROZENT101
Master Data Relations Join Conditions
Order Number
  • Client
  • Order Number
  • 2LIS_04_P_ARBPL.MANDT == AUFK.MANDT
  • 2LIS_04_P_ARBPL.AUFNR == AUFK.AUFNR
Material Number
  • Client
  • Material Number
  • 2LIS_04_P_ARBPL.MANDT == MARA.MANDT
  • 2LIS_04_P_ARBPL.MATNR == MARA.MATNR
Planning Plant for an Order
  • Client
  • Planning Plant for an Order
  • 2LIS_04_P_ARBPL.MANDT == T001W.MANDT
  • 2LIS_04_P_ARBPL.PWERK == T001W.WERKS
Plant
  • Client
  • Plant
  • 2LIS_04_P_ARBPL.MANDT == T001W.MANDT
  • 2LIS_04_P_ARBPL.WERKS == T001W.WERKS