A_ProductSupplyPlanning

Supply Planning Data | view: APRODSUPPLYPLNG | TRAN | Extraction: Not supported | Component: Material Master
Tables used: MARAMARAT001T001KT001WMARC
Column Name Description
Product FK Product Number
Plant FK Plant
Column Name Description
💲 Currency Key (Currency):
LotSizeIndependentCosts Lot-Size-Independent Costs
Column Name Description
📏 Base Unit of Measure (BaseUnit):
FixedLotSizeQuantity Fixed lot size
MaximumLotSizeQuantity Maximum Lot Size
MinimumLotSizeQuantity Minimum Lot Size
LotSizeRoundingQuantity Rounding value for purchase order quantity
SafetyStockQuantity Safety Stock
MinimumSafetyStockQuantity Minimum Safety Stock
MaximumStockQuantity Maximum Stock Level
ReorderThresholdQuantity Reorder Point
Column Name Description
EffectiveOutDate Effective-Out Date
Column Name Description
ProcurementType Procurement Type Show values
ProdRqmtsConsumptionMode Consumption mode Show values
IsSafetyTime Safety time indicator (with or without safety time) Show values
IsMRPDependentRqmt MRP relevancy for dependent requirements Show values
ProductIsForCrossProject Indicator for cross-project material Show values
MRPAvailabilityType Mixed MRP indicator Show values
RepetitiveManufacturingIsAllwd Repetitive Manufacturing Enabled Show values
DependentRequirementsType Dependent requirements ind. for individual and coll. reqmts Show values
IsBulkMaterialComponent Indicator: bulk material Show values
ProductIsToBeDiscontinued Discontinuation indicator Show values
ProdRqmtsAreConsolidated Indicator for Requirements Grouping Show values
MatlCompIsMarkedForBackflush Indicator: Backflush Show values
Column Name Description Domain name
PlanningTimeFence Planning time fence FXHOR
PlannedDeliveryDurationInDays Planned Delivery Time in Days DEC3
SafetyDuration Safety Time (in Workdays) NUMC2
TotalReplenishmentLeadTime Total replenishment lead time (in workdays) DEC3
AssemblyScrapPercent Assembly scrap in percent DEC3_2
GoodsReceiptDuration Goods receipt processing time in days DEC3
BackwardCnsmpnPeriodInWorkDays Consumption Period: Backward VRINT
FwdConsumptionPeriodInWorkDays Consumption period: Forward VRINT
InHouseProductionTime In-house production time DEC3
SrvcLvl Service level DEC2_1
RqmtQtyRcptTaktTmeInWrkgDays Takt time DEC3
ComponentScrapInPercent Component Scrap in Percent DEC3_2
Master Data Relations Join Conditions
Value Table for ABC Indicator
  • ABC Indicator
  • Client
  • A_PRODUCTSUPPLYPLANNING.ABCINDICATOR == TMABC.MAABC
  • A_PRODUCTSUPPLYPLANNING.MANDT == TMABC.MANDT
Checking Group for Availability Check
  • Client
  • Checking Group for Availability Check
  • A_PRODUCTSUPPLYPLANNING.MANDT == TMVF.MANDT
  • A_PRODUCTSUPPLYPLANNING.AVAILABILITYCHECKTYPE == TMVF.MTVFP
Unit of Measure
  • Client
  • Base Unit of Measure
  • A_PRODUCTSUPPLYPLANNING.MANDT == T006.MANDT
  • A_PRODUCTSUPPLYPLANNING.BASEUNIT == T006.MSEHI
Currency Key
  • Client
  • Currency Key
  • A_PRODUCTSUPPLYPLANNING.MANDT == TCURC.MANDT
  • A_PRODUCTSUPPLYPLANNING.CURRENCY == TCURC.WAERS
Default storage location for external procurement
  • Default storage location for external procurement
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.DFLTSTORAGELOCATIONEXTPROCMT == T001L.LGORT
  • A_PRODUCTSUPPLYPLANNING.MANDT == T001L.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T001L.WERKS
Follow-Up Material
  • Follow-Up Material
  • Client
  • A_PRODUCTSUPPLYPLANNING.FOLLOWUPPRODUCT == MARA.MATNR
  • A_PRODUCTSUPPLYPLANNING.MANDT == MARA.MANDT
Lot size
  • Client
  • Lot Sizing Procedure within Materials Planning
  • A_PRODUCTSUPPLYPLANNING.MANDT == T439A.MANDT
  • A_PRODUCTSUPPLYPLANNING.LOTSIZINGPROCEDURE == T439A.DISLS
Material Requirements Planning (MRP) Group
  • MRP Group
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MRPGROUP == T438M.MTART
  • A_PRODUCTSUPPLYPLANNING.MANDT == T438M.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T438M.WERKS
Key for time-phased materials planning
  • PPC Planning Calendar
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MRPPLANNINGCALENDAR == T439G.MRPPP
  • A_PRODUCTSUPPLYPLANNING.MANDT == T439G.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T439G.WERKS
MRP profile
  • Material: MRP profile
  • Client
  • A_PRODUCTSUPPLYPLANNING.MRPPROFILE == MDIP.DISPR
  • A_PRODUCTSUPPLYPLANNING.MANDT == MDIP.MANDT
MRP controller
  • MRP Controller
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MRPRESPONSIBLE == T024D.DISPO
  • A_PRODUCTSUPPLYPLANNING.MANDT == T024D.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T024D.WERKS
MRP type
  • MRP Type
  • Client
  • A_PRODUCTSUPPLYPLANNING.MRPTYPE == T438A.DISMM
  • A_PRODUCTSUPPLYPLANNING.MANDT == T438A.MANDT
Period Profile for Safety Time
  • Period Profile for Safety Time
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.PERDPRFLFORSFTYTME == T438V.SHPRO
  • A_PRODUCTSUPPLYPLANNING.MANDT == T438V.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T438V.WERKS
Planning Cycle
  • Planning Cycle
  • Client
  • ?
  • A_PRODUCTSUPPLYPLANNING.PLANANDORDERDAYDETERMINATION == T439G.MRPPP
  • A_PRODUCTSUPPLYPLANNING.MANDT == T439G.MANDT
  • A_PRODUCTSUPPLYPLANNING.[column in domain "WERKS_D"] == T439G.WERKS
Action Control: Planned Order Processing
  • ?
  • ?
  • Client
  • Action Control: Planned Order Processing
  • A_PRODUCTSUPPLYPLANNING.[column in domain "MDACN"] == T46AC.ACCTO
  • A_PRODUCTSUPPLYPLANNING.[column in domain "MDACC"] == T46AC.ACCFM
  • A_PRODUCTSUPPLYPLANNING.MANDT == T46AC.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANNEDORDERACTIONCONTROL == T46AC.MDACH
Planning Strategy Group
  • Planning Strategy Group
  • Client
  • A_PRODUCTSUPPLYPLANNING.PLANNINGSTRATEGYGROUP == T461P.STRGR
  • A_PRODUCTSUPPLYPLANNING.MANDT == T461P.MANDT
Plant
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MANDT == T001W.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T001W.WERKS
Special procurement key
  • Client
  • Special procurement type
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MANDT == T460A.MANDT
  • A_PRODUCTSUPPLYPLANNING.PROCUREMENTSUBTYPE == T460A.SOBSL
  • A_PRODUCTSUPPLYPLANNING.PLANT == T460A.WERKS
Product Number
  • Client
  • Product Number
  • A_PRODUCTSUPPLYPLANNING.MANDT == MARA.MANDT
  • A_PRODUCTSUPPLYPLANNING.PRODUCT == MARA.MATNR
Proposed Supply Area in Material Master Record
  • Client
  • Proposed Supply Area in Material Master Record
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MANDT == PVBE.MANDT
  • A_PRODUCTSUPPLYPLANNING.PROPOSEDPRODUCTSUPPLYAREA == PVBE.PRVBE
  • A_PRODUCTSUPPLYPLANNING.PLANT == PVBE.WERKS
Plant range of coverage profile
  • Client
  • Range of coverage profile
  • Plant
  • A_PRODUCTSUPPLYPLANNING.MANDT == T438R.MANDT
  • A_PRODUCTSUPPLYPLANNING.RANGEOFCVRGPRFLCODE == T438R.RWPRO
  • A_PRODUCTSUPPLYPLANNING.PLANT == T438R.WERKS
Repetitive Manufacturing Profile
  • Repetitive Manufacturing Profile
  • Client
  • A_PRODUCTSUPPLYPLANNING.REPETITIVEMANUFACTURINGPROFILE == T437S.SFPRO
  • A_PRODUCTSUPPLYPLANNING.MANDT == T437S.MANDT
Rounding Profile
  • ?
  • ?
  • Client
  • Rounding Profile
  • A_PRODUCTSUPPLYPLANNING.[column in domain "RDZAE"] == RDPR.RDZAE
  • A_PRODUCTSUPPLYPLANNING.[column in domain "WERKS_D"] == RDPR.WERKS
  • A_PRODUCTSUPPLYPLANNING.MANDT == RDPR.MANDT
  • A_PRODUCTSUPPLYPLANNING.ROUNDINGPROFILE == RDPR.RDPRF
Storage costs percentage
  • Storage Costs Percentage Code
  • Client
  • Plant
  • A_PRODUCTSUPPLYPLANNING.STORAGECOSTSPERCENTAGECODE == T439L.LAGPR
  • A_PRODUCTSUPPLYPLANNING.MANDT == T439L.MANDT
  • A_PRODUCTSUPPLYPLANNING.PLANT == T439L.WERKS
Other Relations | to Master Data Relations ↑ Join Conditions
Splitting indicator
  • Splitting Indicator
  • Client
  • ?
  • Plant
  • A_PRODUCTSUPPLYPLANNING.FORECASTREQUIREMENTSARESPLIT == T439P.AUFTL
  • A_PRODUCTSUPPLYPLANNING.MANDT == T439P.MANDT
  • A_PRODUCTSUPPLYPLANNING.[column in domain "PERKZ"] == T439P.PERKZ
  • A_PRODUCTSUPPLYPLANNING.PLANT == T439P.WERKS