PPH_DD_MAT_CTRL_1

DD Materials | view: V_PPH_DD_MAT_C1 | Extraction: Not supported | Component: Material Requirements Planning
Tables used: PPH_DBVMMARAMDMAT438AMARAT460AT460AMARAMARCMDLVMDMAMARCSDM_AOR
Column Name Description
matnr Material Number
werks Plant
berid MRP Area
Column Name Description
Column Name Description
mabst Maximum Stock Level
Column Name Description
Column Name Description
beskz Procurement Type Show values
attyp Material Category Show values
berty Type of MRP Area Show values
miskz Mixed MRP indicator Show values
ahdis MRP relevancy for dependent requirements Show values
shflg Safety time indicator (with or without safety time) Show values
Column Name Description Domain name
dzeit In-house production time DEC3
wzeit Total replenishment lead time (in workdays) DEC3
webaz Goods receipt processing time in days DEC3
kzaus null
dispo MRP Controller DISPO
plifz Planned Delivery Time in Days DEC3
dismm MRP Type DISMM
eisbe null
sobsl Special procurement type SOBSL
disgr_marc MRP Group DISGR
disgr_mdma MRP Group DISGR
minbe null
shpro Period Profile for Safety Time SHPRO
shzet Safety Time (in Workdays) NUMC2
Master Data Relations Join Conditions
Material Group
  • Material Group
  • Client
  • PPH_DD_MAT_CTRL_1.MATKL == T023.MATKL
  • PPH_DD_MAT_CTRL_1.MANDT == T023.MANDT
Unit of Measure
  • Base Unit of Measure
  • Client
  • PPH_DD_MAT_CTRL_1.MEINS == T006.MSEHI
  • PPH_DD_MAT_CTRL_1.MANDT == T006.MANDT
Material type
  • Material type
  • Client
  • PPH_DD_MAT_CTRL_1.MTART == T134.MTART
  • PPH_DD_MAT_CTRL_1.MANDT == T134.MANDT