CXCV_DDL_TCX00

Compatibility View for TCX00 | view: CXCV_V_TCX00 | Extraction: Not supported | Component: Scheduling
Tables used: TCX00
Column Name Description
werks FK Plant
auftg Order group for capacity planning Show values
aufta Order type in capacity planning
vagrp FK Production Supervisor
Column Name Description
Column Name Description
Column Name Description
Column Name Description
auftg Order group for capacity planning Show values
term1 Lead time scheduling (detailed planning) Show values
kapk1 Indicator: Generate capacity reqmts (detailed planning) Show values
term1_2 Lead time scheduling (detailed planning, medium term) Show values
kapk1_2 Create capacity requirements (detailed planning,medium term) Show values
kapk1_3 Create capacity requirements (detailed planning, long term) Show values
term1_3 Lead time scheduling (detailed planning, long term) Show values
line_term Takt time-/rate-based scheduling of planned order Show values
term2 -INVALID FOR S/4- Lead time scheduling (rate-based planning) Show values
kapk2 -INVALID FOR S/4- Create cap. rqmts (rate-based planning) Show values
term3 Lead time scheduling (rough-cut planning) Show values
kapk3 Create cap. rqmts (rough-cut planning) Show values
dadj1 Scheduling level for adjusting basic dates Show values
dadj2 Adjust dates in lead time scheduling Show values
dadj3 Adjusting dates when dispatching planned orders Show values
term_auto Indicator: Calculate dates automatically during saving Show values
prot_auto Display scheduling log automatically Show values
matfrueh Latest date for material staging Show values
breaks Indicator: Scheduling allowing for breaks Show values
prod_dates Scheduling based on production dates Show values
auf_shift Indicator: Shift order/network Show values
redst_max Maximum reduction level Show values
red_art Reduction Type Show values
term_kper Rescheduling in Workforce Planning Show values
cmact Assignment Material Staging Operation Segment Show values
Column Name Description Domain name
phori Scheduling horizon (detailed planning) NUMC3
apls1 Selection ID (detailed planning) CP_SEL_ID
phori_2 Scheduling horizon (detailed planning, medium term) NUMC3
apls1_2 Selection ID for routing (detailed planning, medium term) CP_SEL_ID
phori_3 Scheduling horizon (detailed planning, long term) NUMC3
apls1_3 Selection ID for routing (detailed planning, long term) CP_SEL_ID
rathr -INVALID FOR S/4- Rate-based planning horizon NUMC3
apls2 -INVALID FOR S/4- Selection ID (rate-based planning) CP_SEL_ID
grohr Rough-cut planning horizon NUMC3
apls3 Selection ID (rough-cut planning) CP_SEL_ID
termkz Scheduling type TERART
stverg Maximum number of days start date can be in the past STVERG
redvs_s1 Reduction of Floats Before and After Production (%) CX_RPROZ
redvs_s2 Reduction level 2: Red. of floats bef./after prod. (in %) CX_RPROZ
redvs_s3 Reduction level 3: Red. of floats bef./aft. prod. (in %) CX_RPROZ
redvs_s4 Reduction level 4: Red. of floats bef./aft. prod. (in %) CX_RPROZ
redvs_s5 Reduction level 5: Red. of floats bef./aft. prod. (in %) CX_RPROZ
redvs_s6 Reduction level 6: Red. of floats bef./aft. prod. (in %) CX_RPROZ
Master Data Relations Join Conditions
Production Supervisor
  • Plant
  • Client
  • Production Supervisor
  • CXCV_DDL_TCX00.WERKS == T024F.WERKS
  • CXCV_DDL_TCX00.MANDT == T024F.MANDT
  • CXCV_DDL_TCX00.VAGRP == T024F.FEVOR
Plant
  • Plant
  • Client
  • CXCV_DDL_TCX00.WERKS == T001W.WERKS
  • CXCV_DDL_TCX00.MANDT == T001W.MANDT